v0.3.2 — AI Code Review & Ghost Text

Code Smarter.
Ship Faster.

A lightweight, AI-powered desktop IDE — Monaco editor, inline completions, Git integration, and zero bloat.

Windows MIT License Open Source ~90 MB
Axiowisp IDE — Monaco editor with AI completions, file explorer, and integrated terminal

30+ languages · Monaco Editor · IntelliSense

JavaScriptJavaScript
TypeScriptTypeScript
PythonPython
RustRust
GoGo
JavaJava
C++C++
C#C#
PHPPHP
RubyRuby
HTML5HTML
CSS3CSS
KotlinKotlin
SwiftSwift
ReactReact
VueVue
DartDart
SassSass
LuaLua
BashBash
JavaScriptJavaScript
TypeScriptTypeScript
PythonPython
RustRust
GoGo
JavaJava
C++C++
C#C#
PHPPHP
RubyRuby
HTML5HTML
CSS3CSS
KotlinKotlin
SwiftSwift
ReactReact
VueVue
DartDart
SassSass
LuaLua
BashBash

Capabilities

Everything you need. Nothing you don't.

A focused set of tools designed for real development workflows.

Inline AI Completions

Ghost text suggestions appear as you type. Uses your own API key with OpenAI, Anthropic, or Gemini. Tab to accept.

AI Code Review

Right-click any file for instant feedback on security risks, performance issues, bugs, and code style. Categorized by severity.

AI Chat

Context-aware assistant that reads your workspace and active file. Suggests code changes as diffs you can accept or reject.

Git Integration

Source control panel with branch display, file staging, commit, push, and pull. No terminal required.

Find & Replace

Search inside file contents across your entire project. Results grouped by file with one-click replace all.

Project Dashboard

Lines of code by language, largest files, TODO/FIXME count, and full dependency overview in one tab.

Integrated Terminal

PowerShell and Bash via node-pty and xterm.js. New, clear, and kill actions built into the panel.

Themes & Settings

Custom dark and light themes with a full CSS variable engine. Font size, tab size, word wrap, minimap — all configurable.

File Associations

Registers as "Open With" handler for 30+ file types. Click a file on your desktop, it opens in Axiowisp.

AI Features

AI that works for you

Connect your own API key. Your data stays local — the only network calls go directly to your chosen provider.

  • Ghost completions after 800ms of idle typing
  • Chat reads your workspace structure for context
  • Code review categorizes issues by severity
  • Suggested changes shown as inline diffs
  • OpenAI, Anthropic, and Gemini supported
Axiowisp AI integration — inline completions and code review panel
30+
File Types
3
AI Providers
15+
Shortcuts
100%
Open Source

Supported Providers

Bring your own API key

Connect to the leading AI platforms. Your key, your data, your choice.

OpenAI
Industry-leading language models for code completion, review, and chat assistance.
GPT-4o GPT-4o Mini GPT-4 Turbo GPT-3.5
Anthropic
Claude models optimized for safe, accurate code generation and in-depth analysis.
Claude 3.5 Sonnet Claude 3 Opus Claude 3 Haiku
Google Gemini
Multimodal models from Google DeepMind for fast and versatile code assistance.
Gemini 1.5 Pro Gemini 1.5 Flash Gemini 1.0 Pro

Editor

Built for real work

Tab management, unsaved changes prompts, auto-save, breadcrumbs, and a command palette with 12+ actions. The details that matter.

  • Monaco Editor with IntelliSense
  • Git staging, commit, push from sidebar
  • Drag-to-reorder tabs
  • Auto-save with configurable delay
  • Command palette, Go to Line, Format
Axiowisp Git integration — staging, commit and push from sidebar

Project Insights

Know your codebase, instantly

The built-in Project Dashboard gives you a full picture of your repo — no external tools needed.

  • Lines of code broken down by language
  • Top 10 largest files at a glance
  • TODO / FIXME count across the project
  • Full dependency overview from package.json
  • Open instantly with Ctrl+D
Axiowisp Project Dashboard — language breakdown, LOC stats and dependency overview
Get started in seconds

Ready to try it?

Download the latest release or build from source. Free, open-source, and always will be.